등록인repojaehoon
등록/수정일17.03.02 / 17.03.02
문서분량5 페이지
다운로드0
구매평가
판매가격1,300원
Operations Management 생산운영관리 krajewski ritzman malhotra 16장 연습문제풀이
4. Product A is made from components B and C. Item B, in turn, is made from D and E. Item C also is an intermediate item, made from F and H. Finally, intermediate item E is made from H and G. Note that item H has two parents. The following are item lead times:
14. The partially completed inventory record for the tabletop subassembly in Figure 16.33 shows gross requirements, scheduled receipts, lead time, and current on-hand-inventory.
Operations Management 생산운영관리 krajewski ritzman malhotra 16장 연습문제풀이
4. Product A is made from components B and C. Item B, in turn, is made from D and E. Item C also is an intermediate item, made from F and H. Finally, intermediate item E is made from H and G. Note that item H has two parents. The following are item lead times:
14. The partially completed inventory record for the tabletop subassembly in Figure 16.33 shows gross requirements, scheduled receipts, lead time, and current on-hand-inventory.
구매평가 기록이 없습니다 |
· 해피레포트는 다운로드 받은 파일에 문제가 있을
경우(손상된 파일/설명과 다른자료/중복자료 등)
1주일이내 환불요청 시 환불(재충전) 해드립니다.
(단, 단순 변심 및 실수로 인한 환불은 되지 않습
니다.)
· 파일이 열리지 않거나 브라우저 오류로 인해 다운
이 되지 않으면 고객센터로 문의바랍니다.
· 다운로드 받은 파일은 참고자료로 이용하셔야 하
며,자료의 활용에 대한 모든 책임은 다운로드 받은
회원님에게 있습니다.